NTPC Expands Group Capacity to 90,857 MW with 800 MW Patratu Unit Start
NTPC Limited announces the commercial operation of the 800 MW Unit#2 at Patratu STPP Phase-1. Total group installed capacity now stands at a massive 90,857 MW.
ALFA News
Straight from the exchange filing
Latest NTPC Ltd stock news from NSE and BSE filings, 4 stories so far.
NTPC Limited announces the commercial operation of the 800 MW Unit#2 at Patratu STPP Phase-1. Total group installed capacity now stands at a massive 90,857 MW.
NTPC group announces the commercial operation of 62.5 MW solar capacity in Rajasthan, taking its total group installed capacity to a significant 89,868 MW mark.