Saturday, 31 October 2026 NSE & BSE filings, as they land
ALFA News Straight from the exchange filing
New Order

Bondada Engineering Wins ₹500 Cr NTPC Order for India’s Largest Flow Battery Project

Bondada Engineering has secured a landmark EPC contract from NTPC Renewable Energy Limited for a 100 MWh Vanadium Redox Flow Battery Energy Storage System. This project at Khavda Solar Park represents India's first and largest grid-scale flow battery installation.

Top view of neatly arranged batteries in a box on a contrasting blue surface. Stock photo illustrating Bondada Engineering's new order story.
Photo: Ramesh Kambattan / Pexels
Key numbers
Market Capitalization ₹3,242.94 CrSmall Cap
Revenue Growth YoY 86.31%Annualized
Promoter Holding 61.57%Stable Stake
Order fromNTPC Renewable Energy Limited
Execution period10 Months from receipt of NOA
Deal value₹500 Cr
Share of market cap15.4%
Share of annual revenue19.0%

Key highlights

  • Order value estimated at ₹500 crore for EPC and 10-year operation and maintenance
  • Project features next-generation Vanadium Redox Flow Battery (VRFB) technology
  • Execution timeline set for 10 months from the notification of award
  • Collaboration with Delectrik Systems Pvt Ltd as the specialized technology partner
  • VRFB systems offer a 25-year service life, significantly outlasting lithium-ion alternatives

Project Scope and Strategic Impact

The EPC package encompasses the development of a 100 MWh Vanadium Redox Flow Battery Energy Storage System (BESS) at the Khavda Solar Park in Gujarat. Unlike conventional lithium-ion systems that rely on imported cells, VRFB technology utilizes domestic vanadium resources, enhancing India's indigenous energy security. The system is designed for high intrinsic safety and stable performance under frequent cycling with near-zero degradation.

The contract includes a 10-year operation and maintenance period, ensuring sustained technical oversight and steady revenue streams for Bondada Engineering as it diversifies its portfolio into advanced long-duration energy storage solutions.

Client Profile and Technological Advantages

NTPC Renewable Energy Limited, a subsidiary of India's largest power conglomerate NTPC Limited, awarded the contract to Bondada Engineering and its partner Delectrik Systems. This choice underscores the shift toward Long Duration Energy Storage (LDES) to manage grid stability in renewable-heavy zones. VRFB technology offers several advantages over Lithium Iron Phosphate (LFP) systems, including a significantly longer service life of over 25 years compared to the typical 12-15 years for LFP.

By adopting this next-generation solution, Bondada positions itself at the forefront of the Indian utility-scale storage market, reducing long-term import dependence.

Bondada Engineering · share price, past month

Financial Performance and Growth Trajectory

Bondada Engineering has demonstrated impressive financial health, with its annual operating revenue growing by 86.31% to reach ₹2,634.94 crore. The company maintains a robust return on equity (ROE) of 30.25% and a net profit of ₹184.21 crore for the annual period. While the stock's recent performance is categorized as a Falling Comet with a momentum score of 33.74, the influx of high-value infrastructure orders like the NTPC BESS project provides significant revenue visibility.

The ₹500 crore contract represents a substantial addition to the company's order book, reinforcing its standing in the construction and engineering sector.

Industry Landscape and Market Opportunity

  • The Government of India aims to deploy 236 GWh of battery energy storage capacity by 2030 to support renewable grid integration.
  • Current national installed storage capacity is approximately 3.3 GWh, indicating a massive growth runway for early movers like Bondada.
  • Flow batteries are increasingly preferred for grid-scale applications due to their thermal stability and non-flammable electrolyte chemistry.
  • Increased focus on domestic vanadium resources aligns with national self-reliance goals in the critical minerals and green energy sectors.
  • Bondada’s entry into LDES technologies complements its existing renewable energy EPC portfolio in a rapidly consolidating sector.
Bondada Engineering · financial snapshot
Share price₹290.4
Market capitalisation₹3,242.94 Cr
Revenue (annual)₹2,634.94 Cr
Net profit (annual)₹184.21 Cr
Revenue (latest quarter)₹852.13 Cr+27.95% vs previous quarter
Net profit (latest quarter)₹51.90 Cr+4.12% vs previous quarter
P/E (TTM)17.6×Sector 35.31×
Promoter holding61.57%+0.02% QoQ
FII holding0.58%Current quarter

Reference market data from a third-party provider, as of the story. Not a valuation or a recommendation.

Source verified

Exchange filing by Bondada Engineering Ltd announcing the receipt of a Notification of Award for a 100 MWh BESS project. Market figures from a third-party data provider.

Read the filing ↗
All Bondada Engineering filings and newsView all → Every Bondada Engineering announcement on ALFA FilingsSee filings →

More from Bondada Engineering

All →

More in New Orders

All →