Thursday, 29 October 2026 NSE & BSE filings, as they land
ALFA News Straight from the exchange filing
New Order

ACME Solar Subsidiary Inks 400 MW Power Purchase Agreement with NTPC at ₹4.37 Tariff

ACME Solar Holdings Limited has announced that its wholly owned subsidiary, ACME Marigold Urja Private Limited, executed a Power Purchase Agreement with NTPC Limited. The contract involves a 400 MW Firm and Dispatchable Renewable Energy project with a fixed tariff of ₹4.37 per unit.

View of electric transmission towers stretching across a rural field with mountains in the background. Stock photo illustrating ACME Solar Holdings' new order story.
Photo: Robert So / Pexels
Key numbers
Market Cap ₹29,063 CrMid-range Performer
P/E TTM 48.16Sector PE 20.96
1Yr Return 44.98%Price Performance
RSI 49.72Neutral Zone
Order fromNTPC Limited
Execution periodScheduled Commencement of Supply Date 30.06.2028; project tenure 25 years from SCSD

Key highlights

  • Agreement signed for a 400 MW Firm and Dispatchable Renewable Energy (FDRE) project
  • Contract executed under NTPC FDRE Tranche 01 with a fixed tariff of ₹4.37 per unit
  • Scheduled Commencement of Supply Date (SCSD) is set for June 30, 2028
  • Project tenure spans 25 years from the commencement of supply
  • Company's total contracted portfolio capacity reaches 8,400 MW as of October 2026

Long-Term Energy Supply to NTPC

ACME Solar Holdings, through its subsidiary ACME Marigold Urja Private Limited, has formalised a long-term commitment with NTPC Limited for a 400 MW power project. This agreement is part of the Firm and Dispatchable Renewable Energy Tranche 01, designed to provide steady renewable power. The project is structured with a 25-year tenure starting from the Scheduled Commencement of Supply Date, which is fixed for June 30, 2028.

By securing a tariff of ₹4.37 per unit, the company ensures a stable revenue stream for over two decades, reinforcing its position in the competitive utilities sector and supporting India's green energy transition goals.

Growing Portfolio and Bidding Pipeline

  • The company reported a contracted portfolio of 8,400 MW as of October 28, 2026, across operational and under-construction sites
  • Management has upgraded its 2030 renewable generation target from 10 GW to 15 GW to meet rising demand
  • A near-term bidding pipeline of over 20 GW exists across Solar, BESS, and FDRE categories
  • The current project follows a recent 300 MW PPA with SECI signed on October 19, 2026, at a tariff of ₹6 per unit
  • ACME Solar previously secured a 250 MW FDRE project through a PPA with NHPC in January 2026
ACME Solar Holdings · share price, past month

Financial Performance Context

The news of the NTPC agreement follows a strong financial quarter for ACME Solar. For the period ended June 30, 2026, the company achieved an operating revenue of ₹857.5 crore, marking a 67.8% year-on-year increase. Net profits for the same quarter rose 79.9% to ₹235.33 crore, while operating margins remained high at 85.6%.

This operational efficiency, combined with a TTM net profit of ₹603.43 crore, provides the financial cushion needed to execute large-scale projects like the NTPC contract. The company is also expanding its battery storage footprint, targeting over 12 GWh of BESS commissioning by FY27.

Earlier announcements by ACME Solar Holdings
DateAnnouncementAmount
19 Oct 2026Signed PPA with SECI for 300 MW / 1,200 MWh assured peak supply under SECI FDRE-IX tranche at Rs 6/unitSource: BSE filing–
28 Aug 2026Received Letter of Award from SECI for 300 MW assured peak power project under SECI-FDRE-IX tenderSource: BSE filing–
26 Aug 2026Signed 25-year PPA with Northeast Frontier Railway for a 130 MW round-the-clock renewable energy projectSource: powerpeakdigest.com–
21 Jul 2026Signed 25-year PPA with SECI for a 300 MW ISTS-connected wind-solar hybrid project under Hybrid Tranche IXSource: BSE filing–
02 Mar 2026Signed two PPAs aggregating 450 MW with SJVN for firm and dispatchable renewable energy projectsSource: NSE filing–
30 Jan 2026Signed PPA with NHPC for 250 MW ISTS-connected FDRE Tranche-VI projectSource: acmesolar.in–

What to watch next

  • Scheduled commercial operation of the 35.77 MW BESS project at Bikaner on October 29, 2026
  • Updates on the execution of the 12+ GWh BESS commissioning guidance for FY27
  • Results of the 20 GW bidding pipeline tenders in the coming quarters
ACME Solar Holdings · financial snapshot
Share price₹411.15
Market capitalisation₹29,063.14 Cr
Revenue (annual)₹2,023.38 Cr
Net profit (annual)₹498.92 Cr
Revenue (latest quarter)₹857.50 Cr+56.52% vs previous quarter
Net profit (latest quarter)₹235.33 Cr+68.92% vs previous quarter
P/E (TTM)48.16×Sector 20.96×
Promoter holding71.4%0.00% QoQ
FII holding6.44%Current quarter

Reference market data from a third-party provider, as of the story. Not a valuation or a recommendation.

Source verified

Exchange filing by ACME Solar Holdings Limited announcing the execution of a Power Purchase Agreement with NTPC Limited. Market figures from a third-party data provider.

Read the filing ↗
All ACME Solar Holdings filings and newsView all → Every ACME Solar Holdings announcement on ALFA FilingsSee filings →

More from ACME Solar Holdings

All →

More in New Orders

All →