ALFA Finder India's fastest NSE & BSE filing alerts on Telegram, filtered to the stocks you hold Telegram alerts alfafinder.com →
Saturday, 21 November 2026 NSE & BSE filings, as they land
ALFA News Straight from the exchange filing
New Order

Ashoka Buildcon JV Emerges L1 for ₹2,758 Crore Rajasthan Metro Rail Projects

Ashoka Buildcon Limited, acting as the lead member in a joint venture with SAM India, has been declared the lowest bidder (L1) for two significant Jaipur Metro Phase-II infrastructure projects. The combined quoted price for these projects is ₹2,758.31 crore, representing a massive expansion of the company's order pipeline.

Aerial view of a metro train traversing an urban cityscape with dense buildings and greenery. Stock photo illustrating Ashoka Buildcon's new order story.
Photo: Devansh Rajput / Pexels
Key numbers
Project Value ₹2,758.31 CrL1 Status Aggregate
Market Cap ₹3,089.08 CrSmall Cap
Revenue TTM ₹6,785.86 CrRoads & Highways
P/E TTM 1.36xSector: 34.34x
Order fromRajasthan Metro Rail Corporation Ltd.
Execution period36 months
Deal value₹2,758.31 Cr
Share of market cap89.3%
Share of annual revenue40.6%

Key highlights

  • Declared Lowest Bidder (L1) for two Rajasthan Metro Rail Corporation projects totaling ₹2,758.31 crore including GST
  • The aggregate project value represents approximately 89.3% of the company's total market capitalization
  • Package 3 involves design and construction of an elevated viaduct and 12 elevated stations for Jaipur Metro Phase-II
  • Package 4 covers an elevated viaduct and 11 stations plus modifications to the operational Phase-1 corridor
  • Both projects carry a fixed execution timeline of 36 months from the date of official award

Jaipur Metro Phase-II Project Scope

The Rajasthan Metro Rail Corporation Limited (RMRCL) projects involve extensive infrastructure work for the Jaipur Metro Phase-II. Package 3 focuses on the design and construction of an elevated viaduct along with 12 elevated stations, including comprehensive architectural finishing. Package 4 encompasses similar viaduct and station construction for 11 locations, while also requiring modifications to the existing operational corridor of Phase-1 and the construction of the Khasa Kothi station.

Both packages are awarded on a lump sum contract basis and include a 12-month defect liability period to ensure infrastructure quality.

Strategic Surge in Order Inflows

  • November 17, 2026: Declared L1 by NHAI for the ₹1,465 crore Vadodara-Mumbai Expressway balance work in Gujarat
  • November 11, 2026: Awarded a ₹494.77 crore solar EPC contract in Bhutan by Druk Green Power Corporation
  • November 09, 2026: Secured an ₹865.90 crore LoA from NHAI for expressway construction between Karvad and Jujuwa
  • October 09, 2026: Received a ₹290.23 crore railway electrification order for the Gorakhpur-Chhapra section
  • August 29, 2026: Bagged a ₹602.16 crore order from RVNL for electro-mechanical systems in Uttarakhand
Ashoka Buildcon · share price, past month

Alignment with Management Revenue Guidance

The emergence as L1 for these ₹2,758.31 crore metro projects aligns closely with management's stated growth objectives. On November 13, 2026, Managing Director Satish Parakh guided for incremental order additions of ₹3,000 crore to ₹5,000 crore for the second half of fiscal year 2027. This latest metro win, combined with recent NHAI expressway contracts, places the company on a strong trajectory to meet its 9% to 10% operating revenue growth projection for FY2027.

Despite reporting a net loss in the September 2026 quarter, the company maintains a Piotroski score of 6, indicating stable financial health during this heavy execution phase.

Earlier announcements by Ashoka Buildcon
DateAnnouncementAmount
17 Nov 2026Declared lowest bidder (L-1) by NHAI for balance work of 8-lane Vadodara-Mumbai Expressway (Jujuwa to Gandeva section, Km 154.6 to Km 190) in GujaratSource: businesstoday.in₹1,465.00 Cr
11 Nov 2026Letter of Acceptance from Druk Green Power Corporation for EPC of 120 MWp Wobthang Solar PV Power Plant in BhutanSource: alphatribe.in₹494.77 Cr
09 Nov 2026Letter of Acceptance from NHAI for balance work of 8-lane Vadodara-Mumbai Expressway (Karvad to Jujuwa section, Km 128.0 to Km 154.6) in GujaratSource: projectsinindia.ai₹865.90 Cr
09 Oct 2026Letter of Acceptance from North Eastern Railway for traction sub-stations and switching posts on Gorakhpur Cantt-Chhapra Gramin sectionSource: steelcitynettrade.com₹290.23 Cr
29 Aug 2026Letter of Acceptance from Rail Vikas Nigam Limited (RVNL) for electro-mechanical systems for four tunnels on Rishikesh-Karnprayag rail lineSource: angelone.in₹602.16 Cr
26 Jun 2026Letter of Acceptance from Central Housing and Planning Authority, Guyana for Versailles to Parika four-lane highwaySource: ashokabuildcon.com–

What to watch next

  • Issuance of formal Letter of Acceptance (LoA) from Rajasthan Metro Rail Corporation Ltd.
  • Financial results for the quarter ending December 31, 2026, expected in February 2027.
  • Project commencement and site mobilization for Jaipur Metro Package 3 and Package 4.
  • Achievement of construction milestones for the recently awarded Vadodara-Mumbai Expressway sections.
Ashoka Buildcon · financial snapshot
Share price₹110.04
Market capitalisation₹3,089.08 Cr
Revenue (annual)₹7,519.88 Cr
Net profit (annual)₹2,550.01 Cr
Revenue (latest quarter)₹1,504.62 Cr+0.33% vs previous quarter
Net profit (latest quarter)-₹118.79 Cr-192.97% vs previous quarter
P/E (TTM)1.36×Sector 34.34×
Promoter holding54.48%0.00% QoQ
FII holding4.18%Current quarter

Reference market data from a third-party provider, as of the story. Not a valuation or a recommendation.

Source verified

Exchange filing by Ashoka Buildcon Limited announcing its status as the Lowest Bidder for two major Jaipur Metro projects. Market figures from a third-party data provider.

Read the filing ↗
Every Ashoka Buildcon announcement on ALFA FilingsSee filings →

More in New Orders

All →